Dry electrostatic precipitator

Process

Exhaust gas purification of a biomass combustion plant

Separation data

  • Volume flow: 48,000 Bm³/h
  • Temperature (operation): 181°C
  • Pressure (operation): ≈10 hPa
  • Temperature (design): 250°C
  • Pressure (design): ≈ 25 hPa
  • Dust / boiler ash

Scope of services

  • Dry electrostatic precipitator
  • Control system
  • Discharge systems

Latest references

Complete the details


    Your message has been sent.
    Thank you for contacting us!




    By filling in the above details, you consent to the processing of your personal data for the purpose of contacting you and preparing a business offer by R&R Beth, and you accept the GDPR provisions and the privacy policy.





    Send a message


    spinner